Galvanized GI GS steel tube

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-02 18:00

  • Browse the number:

    202

Send an inquiries
+
Tianjin Brilliant International Steel Co. Ltd
Contactaixin:

Contactaixin:

brilliantsteel(Mr.)  

telephone:

Area:

Beijing

Address:

Building the Village of Baoxiang, Rhubarb, Wuqingqu, Tianjin, China (301800)

Website:

http://brilliantsteel.newhomebusinessrevolution.com/

+
Model Number: Jess-GI pipe-012 Brand Name: Brilliant Key Specifications/Special Features: Products details:Place of origin: Tianjin, China (Mainland)Grade: Q195-Q345, Q195, Q215, Q235, Q345Application: structure pipe, machinestructure, building and construction and moreAlloy or not: non-alloy
Size OD: 1/4" -24" (5.0mm-716mm)
Wall thickness: 0.5mm-7.5mm
Length: 5.8m, 6m, 11.8m
Steel material Q195 → SS330, ST37, ST42
Q235 → SS400, S235JR
Q345 → S355JR, SS500, ST52
Standard ASTM A53/Grade A/B, BS1387-1985, BS EN 10219: 2006, ISO 65-1981, JIS G444: 2004 STK400
Zinc coating 120g/m2(20m), 270g/m2(40m), 400(60m), 500(70m), 550(80m)
Usage 1)Low pressure liquid, water, gas, oil, line pipe
2)Construction
3)Fence, door pipe
Ends 1) Plain
2) Beveled
3) Thread with Coupling or cap
4) Chamfer
5) Groove
6) Screw
End Protector 1) Plastic pipe cap
2) Iron protector
Surface Treatment 1) Bared
2) Black Painted (varnish coating)
3) Galvanized
4) Oiled
5) PE, 3PE, FBE, corrosion resistant coating, Anti corrosion coating.
Technique Electronic Resistance Welded (ERW )
Electronic Fusion Welded (EFW)
Double Submerged Arc Welded (DSAW)
Welded line type Longitudinal
Section shape Round, round, square, rectangular
Inspection With hydraulic testing, eddy current , infrared test
Package 1) Bundle
2) Bags
Delivery 1) Container
2) Bulk carrier
Delivery time 7-15working days
Shipping Information:
  • FOB Port: China (Mainland)
  • Lead Time: 7 - 15 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America